What are all the major issues you faced during implementation ?
What kind of machines or equipment have you worked with? : insurance sales
Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.
What are the ways to add styles to html?
Tell me what are your long term career goals?
Can any one send me the Sample sanity Test Cases??? Mail id:veerabhadrudu.p@gmail.com
please somebody who have asked questions related to electronic and communication eng siemens 2010-2012 post here
what will be the first salary and what will be the hike in the salary?
1.provide a brief write up on why you consider yourself suitable for the post voting your major achievements? 2. Mention your position in the hierarchy and the levels above and below you ?
Why is data considered crucial in AI projects?
Sir can u send me few interview questions and answers based on Deputy Superintendent(materials) of APSRTC. I have selected in written.reply to bhanudammoju@gmail.com thank u.
Why and when do stored procedure recompile?
What is commercial tax? and what comes under commercial tax? What are the Provisions relating to it?
PLZ ANYONE SEND ME PLACEMENT PAPERS OF I.O.C.L MY ID---- gaurav.nitw.5609@gmailcom
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.