Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z




Wipro C++ General Interview Questions
Questions Answers Views Company eMail

What is the difference between public, private, protected inheritance?

12 51828

What is Virtual Inheritance?

7 10069

What is the difference between operator new and the new operator?

3 8611

What happens if an exception is throws from an, object's constructor and object's destructor?

4 12926

What is the difference between Pointer and a Reference? When you would use them?

4 8761





What are the differences between a struct in C and in C++?

8 12113

What are the differences between a struct and a class in C++?

6 8228

What are the differences between public, private, and protected access?

12 64420

What is the difference between a copy constructor and an overloaded assignment operator?

4 19395

Difference between static global and global?

16 31723

what is the order of initialization for data?

10 15540

How long does this loop run: for(int x=0; x=3; x++) a) Never b) Three times c) Forever

15 25425

What is the output of printf("%d")?

58 41670

What is the Diffrence between a "assignment operator" and a "copy constructor"?

3 5499

What is the Difference between "vector" and "array"?

15 50538

Post New Wipro C++ General Interview Questions




Wipro C++ General Interview Questions





Un-Answered Questions

Explain the steps for creating a services in angular 2?

8


Explain full-text query in sql server?

18


what is the difference between potentiometric titration and karl fischer titration?

1427


Why to use MongoDB?

5


What is msmq?

1






Hi we have an urgent requirement for Java/J2ee technical lead position & also looking for "Java Guidewire claimcentre" experienced professional for Bangalore location if interested can reach srisanh@gmail.com

1905


sir i want syllabus for junior engineer §ion engineer.

1090


sir iam from electrical and electronics branch ,can i appear for the hpcl offline requirtment? if yes please mail me on vikram_raju25@yahoo.co.in

969


1)How to calculate AC Capacity for the Room?

1087


What do the mb31 tcodes in sap- pm mean?

15


What is an update type with reference to a match code id?

29


What is bursting?

20


Assignment A software house got a project to automate sales/purchase department of a furniture store. The store management is clearly transferred their requirements to the software house management. There is no chance of changing the requirements afterwards. Software house management use waterfall process model to make the project. Given is the progress flow of water-fall process model In waterfall process model, the deliverable (document) produced in one phase serves as an input to the next phase. Suppose you are a project manager who is leading this project. It is decided to work and complete the project using waterfall process model approach. You are required to develop a plan in which the key task is to decide the deliverable that should be built during and after completion of each phase. Also give a description or required contents that must be included in those deliverables. You are not supposed to make the complete project. All you are required to do is to make a Project plan. In that, you need to give a set of deliverables (documents) which according to you, should be developed in each of the phase (Requirements, Designing, implementation, Testing, Maintenance). Also provide contents which should be there in each deliverable. The contents should be clear and have brief explanation. Note:: There are one folder and one file in the attached folder. The file is named as Assignment 4 write-up which is your assignment write-up. The other folder named Project deliverables is the folder in which you are required to organize and place your deliverables. Name of the document/deliverable saved in each folder should be mentioned in the file named checklist (This file is placed in the “Project deliverables” folder) For Example If you produce a deliverable named Requirement Specification (RS) in the “Requirements” phase. You need to do following tasks 1) Finalize the RS contents 2) Save the file in sub-folder named Requirements 3) Write the name of this document in the checklist file under the heading Requirements. Similarly, you need to make and save deliverables of each phase. Not all phases contain one deliverable. There must be some phases having more than one deliverables. PLEASE SIR PRIVIDE ME THE CHECK LIST FOR GIVE SENERION ? CHECKLIST ARE: 1-Requirements 2- Designing 3- Implementation 4- Testing 5- Maintenance

5506


what is the meaning of without standing arrears?

7558


we are a manufacturer unit can we purchases of building material agst form "C" or vat C4?

847