why you used Java Script? Can it use for both client side and server side validation purpose?
12 37369What happens if an exception is throws from an, object's constructor and object's destructor?
4 18868Post New Wipro Interview Questions
What do you mean by beanfactory in spring?
How do I become a database administrator?
What are the approaches required to share persistent user-defined objects?
Name several layers of cloud computing?
What stage attracts or catches the exception in blue prism?
What is reflection in c#?
What is SQL Tuning Advisor in Oracle?
How to set session.gc_maxlifetime properly?
What is erp and sap?and why inplementing sap in an organization? Explain the special features of sap over other
Why do we use encapsulation in oops?
An 8 pole, 50 Hz, 3-phase IM is loaded to a poing where pull out torque will occur. The rotor resistance per phase is 0.3 ohm and motor stalls at 650 rpm. The rotor reactance at stand still is A 2 ohm B 1.25 ohm C 3.15 ohm D 2.25 ohm
What is an over accrual?
Explain enum?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
What do you mean by in-memory replication?