why you used Java Script? Can it use for both client side and server side validation purpose?
12 37706Post New HCL Interview Questions
What if I write static public void instead of public static void?
Different types of authentication modes in .net framework ?
list some of the data science libraries in python
Tell me how your supervisor describe you?
Could anyone please share SAP SD Support Project's Priority tickets with detailed solutions ?
sampile paper for dme in rrb exam
Dear sir i need lic model question paper for the last two years, Kindly forward solved question papers to my mail id gsmaliniraj@yahoo.co.in, malinisankaram@gmail.com
could u pls anyone tel me .."which is the best instute that provides eficient practical knowledge and also real-time oriented knowldge to do a project in manual and automation testing..in hyd" pls send me to dis mail-id if u find any..? sinducute17@gmail.com
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
rrbchennaimodel question paper for current papers
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
What are transient properties?
Tell me what kind of things have you done on the social side?
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
can anybody send me some real time screenshots of mapping in informatica powercenter. i will be vary thankful to him. my e-mail id :- prakashkumar.kumhar@gmail.com