Sum of slopes of 2 perpendicular st. lines is given. Find the pair of lines from the given set of options which satisfy the above condition?
1 1334The size of a program is N. And the memory occupied by the program is given by M = square root of 100N. If the size of the program is increased by 1% then how much memory now occupied?
1 1746A Flight takes off at 2 A.M from northeast direction and travels for 11 hours to reach the destination which is in north west direction.Given the latitude and longitude of source and destination. Find the local time of destination when the flight reaches there?
1 1592In the word ORGANISATIONAL, if the first and second, third and forth, fifth and sixth words are interchanged up to the last letter, what would be the tenth letter from right?
1 1953A building with hight D ft shadow upto G A neighbour building with what height shadow C ft is?
1 1328A sales person multiplied a number and get the answer is 3, instead of that number divided by 3. what is th answer he actually has to get ?
1 1303A ship started from port and moving with I mph and another ship started from L and moving with H mph. At which place these two ships meet ?
1 1453low temperature at the night in a city is 1/3 more than 1/2 hinge as higher temperature in a day. sum of the low temp and higherst temp is 100C. then what is the low temperature
1 1490One guy (some name) has Rs. 100/- in hand. He has to buy 100 balls. One football costs Rs. 15/, One Cricket ball costs Re. 1/- and one table tennis ball costs Rs. 0.25 He spend the whole Rs. 100/- to buy the balls. How many of each balls he bought?
1 2324There are 8 stamps, 4 Red and 4 Green. There are three logicians also. One moderator sticks thow stamps each on the forhead of each logician such that each of them can see all the stamps except those on his forhead and the two in moderator's pocket. Then the moderator asked each whether he knows the colors of the stamps he wears? Then the answeres were: A: "No" B: "No" C: "No" A: "No" B: "Yes" What were the colours of the stamps that B wears?
1 1371There are Brown and Black cows. In five days four black cows and 3 brown cows give as mush as milk that four brown cows and 5 black cows give in four days. If the black cow gives 10 litres of milk per day, how many liters of milk the Brown cow will give in one day? (Numbers are not certain)
1 1388There are following denominations of money: 1, 2, 5, 10, 20, 50, and 100 paise. Alex has as twice mony as David, who has as twice as Bindya, who again has as twice money as Charles. Each has two coins in hand. Which coins Bindya has?
1 1331Post New Accenture General Aptitude Interview Questions
how did u celebrate your last birth day ?
What is the latest version of google browser?
What sort of image do you have?
How many post in call center.plz rpl me in step by step.
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
write a c program which accepts input as Anu.B.Kapoor and gives output as:Kapoor.A.B plz send me the ans
Sir, I wish to appear for the written test in the year 2009. But i have no syllabus on the basis of that the exam was held. So if you kindly give me the syllabus,it's easy for me to be prepared. I have already registered through online,and that no is 10857
HI, Anybody is having informatica Dumps,if it there Can u send to my mail id :sathesh.cool@gmail.com
What don't you like about working at Starbucks and what would you change?
pls send me out bound code of supplers,site,bankiformation code pls as soon as
can any one send me the real time interview questions and tockets in sap fico ,my mailid is c.sujatha2008@gmail.com
What is the resourcebundle class?
What’s powershell, and how do you feel about it?
Where can you use global filters?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?