Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z




Accenture L1 Visa Interview Questions
Questions Answers Views Company eMail

Hi, I have done my Engg in Mechanical and passed out in 2006.I have been working with a MNC and on the project for past 14 months. I am going to file my L1. I wanted to know whether i am eligible or not and if so will my engineering in mechanical engg will be a constraint in getting visa.

3 7397

Hi, I do have around 5+ years of experience in IT and my educational qualification is B.Com and 2 years full time diploma in Software Technology. My company is going to process my visa in L blanket, but I believe my educational qualification will not help me to get L1-B, so what are the chance if I apply L1-A rather then L1-B. Please reply. Regards Amit.

1 5134

Post New Accenture L1 Visa Interview Questions




Accenture L1 Visa Interview Questions





Un-Answered Questions

Negative keywords can help advertisers refine the targeting of their ads, and potentially increase in?

1


What is a bad credit score?

897


What is the power analysis?

1


Why should a business prepare fund flow statement?

20


What is preemptive multitasking?

29






How to update license?

13


Assignment A software house got a project to automate sales/purchase department of a furniture store. The store management is clearly transferred their requirements to the software house management. There is no chance of changing the requirements afterwards. Software house management use waterfall process model to make the project. Given is the progress flow of water-fall process model In waterfall process model, the deliverable (document) produced in one phase serves as an input to the next phase. Suppose you are a project manager who is leading this project. It is decided to work and complete the project using waterfall process model approach. You are required to develop a plan in which the key task is to decide the deliverable that should be built during and after completion of each phase. Also give a description or required contents that must be included in those deliverables. You are not supposed to make the complete project. All you are required to do is to make a Project plan. In that, you need to give a set of deliverables (documents) which according to you, should be developed in each of the phase (Requirements, Designing, implementation, Testing, Maintenance). Also provide contents which should be there in each deliverable. The contents should be clear and have brief explanation. Note:: There are one folder and one file in the attached folder. The file is named as Assignment 4 write-up which is your assignment write-up. The other folder named Project deliverables is the folder in which you are required to organize and place your deliverables. Name of the document/deliverable saved in each folder should be mentioned in the file named checklist (This file is placed in the “Project deliverables” folder) For Example If you produce a deliverable named Requirement Specification (RS) in the “Requirements” phase. You need to do following tasks 1) Finalize the RS contents 2) Save the file in sub-folder named Requirements 3) Write the name of this document in the checklist file under the heading Requirements. Similarly, you need to make and save deliverables of each phase. Not all phases contain one deliverable. There must be some phases having more than one deliverables. PLEASE SIR PRIVIDE ME THE CHECK LIST FOR GIVE SENERION ? CHECKLIST ARE: 1-Requirements 2- Designing 3- Implementation 4- Testing 5- Maintenance

5504


How to create a local temporary stored procedure?

21


Examine the marits and Limitations of the obsrvation method in collecting data. Illustrate your answer with suitable example.

978


what is electronically operated pneumatic valves? give one example

1002


How the programmer of a class should decide whether to declare member function or a friend function?

20


can s/w quality assurance engineer switch field to programming side i m very much interested in programming but not much good in it

859


What is the crank length in the slab?

20


What is an asynchronous controller in asp.net mvc?

13


Suppose you need not create separate db for every user in ppsft 8.4 onwards. This is possible because of?

1