Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

Accenture Interview Questions
Questions Answers Views Company eMail

Square side 7 cm. Find the area 4 equal circles of the circle lying drawn at the…

1 1324

The average of 4 consecutive even numbers is 27. What is the largest number?

1 1303

The base 5 representation of the decimal number 2048 is _____.

1 1398

The cost of one pencil, two pens and four erasers is Rs.22 while the cost of five pencils, four pens and two erasers is Rs.32.How much will three pencils, three pens and three erasers cost?

1 1335

The equivalent compound ratio of 5:6::7:10::6:5

1 1350

The lowest temperature in the night in a city A is 1/3 more than 1/2 the highest during the day. Sum of the lowest temperature and the highest temperature is 100 degrees. Then what is the low temp?

1 1359

The various degrees of the vertices are marked in the dig. Find y?

1 1337

There are 1000 doors that are of the open-close type. When a person opens the door he closes it and then opens the other. When the first person goes he opens-closes the doors ion the multiples of 1 i.e., he opens and closes all the doors. When the second goes he opens and closes the doors 2, 4 6 8 rely. Similarly when the third one goes he does this for 3 6 9 12 15th doors rely. Find number of doors that are open at last.

1 1529

There are 150 weights .Some are 1 kg weights and some are 2 kg weights. The sum of the weights is 260.What is the number of 1kg weights?

1 1508

There are 1997 doors in the courts. 1997 people came out from each door. One door is closed. That many people came out from each door. This continues till a single person come out of the single open door. Find the no of people inside the court?

1 1310

There are 200 employees in a company. An external vendor is chosen to Serve coffee twice a day. 100 coffee cups were offered by the company but as an incentive to have the cups in tact at the end of the day, the company offered 30 paise for every cup remained safely and charged 90 paise for every broken cup. At an end of a day, the vendor received Rs. 24. How many cups did the vendor break? 10, 20, 8, 5?

1 2317

There are 4 numbers as 5,8,2,1 Form 4, four digit numbers as A, B and find the sum?

1 1448

There are 40 seats in a bus. People agree to share the money for the number of seats. The total money comes to 70.37. How many seats were free?

1 2054

There are 5 questions based on a murder story.the questions concentrate on the seating arrangements of people mentioned.

1 1376

There are 6 consecutive numbers P, Q, R, S, T, U, not necessarily in that order. Given that, Q is 2 less that P, P is 3 less that T and R is 2 less than S, arrange them in an ascending order.

1 1293

Post New Accenture Interview Questions


Accenture Interview Questions


Un-Answered Questions

Hi i am attended catholic Syrian bank preliminary interview for MBA Specialist office post..if anybody selected pls tel me ur final round interview experience

2568


plz sent me jindal placement papers in mechanical enginnering

2872


Draw the vector diagramme for Asynchronous Induction Generator at noload,half load and fullload.

2106


Are jvm’s platform independent?

989


What is the difference between object { } block and companion object { } code block in Kotlin?

255


who is your famous personality

2820


pls send the technical question paper

2279


send me any model test paper of clerical post of state bank of india.......

1938


How to record the desktop application in Loadrunner 12.53 version 64 bit window.

2317


What is variable initialization and why is it important?

1399


HI, Anybody is having informatica Dumps,if it there Can u send to my mail id :sathesh.cool@gmail.com

2116


kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com

1926


Do you have any professional experience in this field?

1113


dear sir, pls provide me a previous paper for hpcl engineers trainee exam for mechanical engg. this is a request pls do the needful as early as possible.

2047


Calculate the missing figures for company A. A Sales (TSR) (a) Total Variable Costs (TVC) (b) Total Fixed Costs (TFC) $24,000.00 Profit $0.00 Units Sold 1,000.00 Contribution Margin Per Unit (CMU) (c) Contribution Margin Ratio (CMR) (d) Break-Even Point (BEP) (Units) (e) Break-Even Point (BEP) (Dollars) $60,000.00

2238