Hi All, This is regarding ETL testing. I have 3.5 years of experience in software testing. I have used web and DB testing so far. I am currently projected for ETL testing by using which is very new to me. We are using Informatica for running the sessions and taking the logs. I would like to know whats the process we have to follow for this testing. Ie., From kickoff to signoff. Can please anyone give brief explanation on that. Do we have any certification for ETL Testing??
152 123342How to track the requirement from bugzilla tools? As our project requirement are changing frequestly and all are tracked in bugzilla tool. How to manage all as all project having short term duration. Please reply back ASAP? Thanks in advanced?
1758Post New ABC Testing AllOther Interview Questions
What is sap transport domain? : transportation management
What is os tuning?
What is the best alternative to wordpress?
in ‘C’ language for Matrix Multiplication fails” Introspect the causes for its failure and write down the possible reasons for its failure.
How do I reset excel 2016 to default settings?
Can we insert null in hashset?
can any one please tell me the full form of .g.t in silktest datadriven method
What syntax does jenkins use to schedule build job or svn polling?
what id a dry type transformers and its function ?
What is the optimal temperature of the developer solution in a manual film processing setup?
What is drupal?
Define SDLC in UML?
How Do Operations Managers Resolve Conflicts And Negotiate With Others?
How do I remove a second operating system from my computer?
Distribution transformer we provided 2 separate earthing pit for Body and 2 separate earthing pit for neutral,we can not connect separate body earthing pit to other earthing pit but we do metal glanding in secondary side cable termination in both side, transformer and PCC panel (LT Panel), is this safe for transformer and other equipment?