Answer / hussain
Volume of 1 Brick = 0.230*0.115*0.075 = 0.002
So No of brick req for 1 m3 = (1/0.002) = 500 Nos
1.7 bag of Cement required
0.31 cum sand required for 1 cum of brickwork
| Is This Answer Correct ? | 717 Yes | 234 No |
Answer / raja j
brick size in meter=.23*.115*.075 =.0019
add 10 mm mortar for ech sides=(.24*.125*.085)=(.0025)
bricks required for 1 m3 =(1/(0.0025)=400 nos
mortar required =(.0025-.0019)*400=.24
add 15% for wastage = (.24*1.15)=.276m3
so required sand is =.276 m3
cement is =(1440/6)=240*.276= 66 kg
| Is This Answer Correct ? | 283 Yes | 135 No |
Answer / ajeet kumr bhatnagar
Actual brick size 230*115*76
So No's of bricks in 1 m3=1÷.23*.115*.076=498nos
Now consider 10mm thick mortar
Now bricks size =240*125*86cm
No's of bricks in 1m3=1/.24*.125*.86=388nos
5% wastge=388+20=418nos actual
Mortar 498-388=110nos bricks
=110*.23*.115*.076=.22m3
30% for dry volume=0.286m3
Wastage 5%=0.015
Net volume=.286+.015=.3(approx)
Cement=.3÷7=0.042=.042÷.0345=1.24 bags
Sand=.042*6=.252m3 or.252*35.28=8.89cft
| Is This Answer Correct ? | 161 Yes | 30 No |
Answer / tipu sultan
standard size of brick
=(.19×.09×.09)m
volume of brick
=(.19×.09×.09)m^3
=0.001539
=0.00154m^3
with mortar brick size
=(.20×.10×.10)m
& volume=
=(.20×.10×.10)m^3
=0.002m^3
for volume 0.002m^3 then no. of brick=1
so that
for 1m^3 then nos. of brick = 1÷.002 = 500nos.
| Is This Answer Correct ? | 136 Yes | 18 No |
Answer / ajeet kumar bhatnagar
consider brick joint 10mm.
Brick volume 0.23x0.115x0.76=.0020m3
So for 1m3 brick work brick required=1/.0020=500nos
Now taking joint ,volume =.240x.125x0.086=.00245
Now for 1m3 brick work brick require=1/.00258= 388nos
So mortar volume =500-388=112nos brick=112x0.0020=0.32m3
For 1:6 mortar Cement 1/7x0.320=0.0457m3=0.00457/0.0345=1.32bags=1.32x50=66 kg
Sand=6/7x0.32=.274m3x35.28=9.67cft
| Is This Answer Correct ? | 67 Yes | 14 No |
Answer / md.furqan anasri
Bricks :395
Cement:1.25 Bags (CPWD)
C-sand:10 cft
| Is This Answer Correct ? | 88 Yes | 42 No |
Answer / b.jagan
Per 1m3 B.W required materials
Brick=500mom's
Cement=75kg
Sand=10.5cft
| Is This Answer Correct ? | 32 Yes | 14 No |
Answer / asmar ahmed
cement = 1.40 Bags
sand = 10.50 Cft
Bricks = 466 Nos
| Is This Answer Correct ? | 33 Yes | 20 No |
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
I am planning to construction in my plot in Pune (Chandan Nagar) and its near about 1950 SqFt. Can some plz help me on the rate on per sqft for RCC,Brickwork & Plaster,Flooring,Water proofing,Door. Thank you in advance
How to test the soil compaction test?
to achieve the strength upto m-65 concrete what we should add a)more cement b)silica fume c)marecement with fly ash d)flyash
Plz tell me...column and wall section drawing.
what is the weight of 10mm,20mm,40mm aggregate
Calculation of curtain wall of box culvert
SHEAR FORCE AND BENDING MOMENT DIAGRAMS
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
How can i do RCC rate analysis?
what does the track parameter mean in staad.pro?
how much kg of binding wire is used in slab ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)