1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / hussain
Volume of 1 Brick = 0.230*0.115*0.075 = 0.002
So No of brick req for 1 m3 = (1/0.002) = 500 Nos
1.7 bag of Cement required
0.31 cum sand required for 1 cum of brickwork
Is This Answer Correct ? | 717 Yes | 234 No |
Post New Answer View All Answers
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
How good are the Weinerberger Porotherm bricks that are being used in construction in Chennai, India. Its being used in non load bearing walls and has a compressive strength greater that 35 kg/cm^2 and a density of approx.694 - 783 kg/m3.
In block work seawalls what is the purpose of slip joints?
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
what is civil all interview questions
What are the different methods for drawing an arc?
What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
What are the uses of alloys in daily life and how are alloys made?
Tell me about triple point of water.
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...