1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answers were Sorted based on User's Feedback
Answer / ramesh m
find the volume of brick with dimensions and arrive the volume of mortar from total volume.get the cement volume from the ratios given..and use 1440kg/m3 to get bag of cement reqd.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / hassan
As per engineering Books one cum 484 no of bricks .
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / rehaan khan
brick work in 1:6 for 01 cum
cement cost will 1.28 bags
sand will .257cum
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / pawan kumar
350 to 370 Bricks
1.25 No.of bags
10 to 12 c-ft sand with westage
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / umesh sharma
Answer/ Umesh Sharma
Dry material required for 1 cum. of brick masonary =0.30 cum.
Nos'. of brick required for 1 cum. of work = 500 Bricks
Cement required for 1 cum. of brick = 1/7x0.30x28.8 = 1.23 bags.
Sand required for 1 cum. of brick = 6/7x0.03 = 0.257 cum. ( 9.08 cft.)
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / remesh babu pillai .k .p
Bricks .540nos
Sand.10 cft
cement .1.5bags
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / shubham agrawal
Brick=500
Sand=.274cum
Cement=1.3bag or 66 kg
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / gazi
Brick Wall Ft Meter 35.315
Vol of wall 35.3 cft 1.00 m3
"Vol of a brick without morter
9.5X4.5X2.75" 0.1 cft 0.00 m3
"Vol of a brick with morter
10X5X3" 0.1 cft 0.00 m3
Number of brick req 405.9 Nos 405.92 Nos
vol of req brick 27.3 cft 0.77 m3
Moter=brick wall vol-brick vol 8.0 cft 0.23
wet vol 10.4 cft 0.30
Mix ratio 1.0 6 1.00 6
cement vol 1.5 cft 0.04 m3
Cement Bag 1.19 bag 1.192 Bag
Sand 8.9 cft 0.253 m3
Is This Answer Correct ? | 0 Yes | 0 No |
plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?
11 Answers L&T, Sobha Developers,
What is componsation
0 Answers Nagarjuna Construction,
HOW MANY CUBES REQUIRED FOR 7 AND 28 DAYS TEST FOR ALL MIX GRADES.
4 Answers Ansals, HFCL, Jaypee, Pratibha Group,
Define Finite element method (FEM)
what is the problem not getting 7 days slab cycle in Mivan formwork? what is the output of mivan carpenter per day?
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
WHAT ARE TYPES OF STRUCTURES
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
How to calculate Rate of 10 cum of Brick masonary,if the rate of material are as fallow? sand=Rs.500/mt Brick=Rs.5/brick Labour=Rs 300/day Free issue=cement+water+electicity.
how to calculate the quantity of plaster.
What are the uses of alloys in daily life and how are alloys made?
Building construction