Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


m30 mix proportion as per IS code

Answers were Sorted based on User's Feedback



m30 mix proportion as per IS code..

Answer / p. mahesh

no

Is This Answer Correct ?    2 Yes 0 No

m30 mix proportion as per IS code..

Answer / kotyadasaikrishna

No proportion for M30 grade

Is This Answer Correct ?    0 Yes 0 No

m30 mix proportion as per IS code..

Answer / yadav

1:0.75:1.5

Is This Answer Correct ?    0 Yes 2 No

m30 mix proportion as per IS code..

Answer / karnam seenu

1:1:2

Is This Answer Correct ?    4 Yes 12 No

Post New Answer

More Civil Engineering Interview Questions

We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?

0 Answers  


what is pqc

0 Answers   Student,


If at site iam supposed to get M30.But by mistake i got M20 mix. How could I differentiate the mix before placing?

6 Answers  


why curing is necessary?

5 Answers   Gammon,


what is the minimum spacing required for slab & beam reinforcement

5 Answers   Gammon,


how to draw road profile

4 Answers   L&T,


how much cement and sand required for 100sqm of wall plastering in different proportions

0 Answers   Bharti, Pvr Constructions,


why do you desire to change from your current position?

1 Answers  


what means if slump is less than 25mm and greater than 80mm?

7 Answers  


Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?

6 Answers  


What are the Types of foundation?

1 Answers  


levelling least count

5 Answers   NCC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)