consider brick joint 10mm.
Brick volume 0.23x0.115x0.76=.0020m3
So for 1m3 brick work brick required=1/.0020=500nos
Now taking joint ,volume =.240x.125x0.086=.00245
Now for 1m3 brick work brick require=1/.00258= 388nos
So mortar volume =500-388=112nos brick=112x0.0020=0.32m3
For 1:6 mortar Cement 1/7x0.320=0.0457m3=0.00457/0.0345=1.32bags=1.32x50=66 kg
Sand=6/7x0.32=.274m3x35.28=9.67cft

Is This Answer Correct ?    67 Yes 14 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How you can turn off the display for dimension in CAD?

625


During reclamation how can the occurrence of mud waves can be rectified?

814


what is concrete canvas?

1762


show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation

1676


in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?

1831






IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI

1580


List out some of the software program that can be useful for architect?

670


which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?

1565


what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????

1641


what is w/c ratio in dry lean concrete for m10 mix design

7966


can you provide a link for manual design of building?

1116


How many feet are in 4 square yards?

716


what is labour consume factor in residential projects

1843


Why is concrete cube test carried out?

757


What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?

1797