1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / saeed khan
Brick=500
Sand=.257
Cement=1.225 bags
| Is This Answer Correct ? | 14 Yes | 7 No |
Post New Answer View All Answers
The portion of a brick cut across the width is called?
what is anchorage length,lap length and (dont remember the last one)
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
How do we calculate the power of centrifugal pump?
What is the tallest man made structure in the world?
How to calculate unit weight of concrete for m40 grade.
Which tests are performed on soil to decide the type of foundation to be provided.
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
Is there the dry coefficient of cement is constant?
What is progress payment?
What is Critical path in Ms-Project ?
how can calculate cutting length of diamond ring
how to control PQI (Project Quality Index)
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
five benefits of using standard terminology in the measurement process