Why Should Curing Not Be Done By Ponding And Polythene Sheets?
No Answer is Posted For this Question
Be the First to Post Answer
why mixing marble powder reduces setting time of cement
While calculating quantity of cement required for 1 qubic meter If mix is m25 1:1:2 =4 1.52/4=0.38, 0.38x1440=547.20 kgs I know 1440 is unit weight of cement And what is 1.52 ? And some one using 1.54 and 1.53 etc... Why they are using can u explain me what is 1.52, 1.53, 1.54?
what we do if excavation is more than actual requirement
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
how to calculate concrete pouring of foundation
M40 grade concrete has 40 n/mm2 strength.here what"s mean by n?
how many no of light weight solid blocks of size 600x200x200mm required for 1cum of block work
what is diff between auto level and dumpy level?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing.
5 Answers Dee Vee Projects, L&T,
pls mail some more tecnical qustions at msaranya2610@gmail.com
Which type of plywood & sizes using in construction projects ?
What is the bending moment ?
1 Answers L&T, Manav Infra Projects,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)