Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"

Answers were Sorted based on User's Feedback



1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3&q..

Answer / rizwan akbar

bricks 500
cement 1.54 bags
sand .32 m^3
for C:S 1:6 brick work

Is This Answer Correct ?    3 Yes 7 No

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3&q..

Answer / md gyasuddin ahsan arfi

494 bircks,1.029 bags of cement,52.935 Cft of sand

Is This Answer Correct ?    5 Yes 10 No

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3&q..

Answer / syed muhsin.s

Bricks- 417 nos
Cement- 53 kg
Sand - 0.3 cum

mortor thickness deducted to be done.

u want to know how it comes????

Is This Answer Correct ?    10 Yes 19 No

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3&q..

Answer / vivek rai

1M=39.37Inch.
1Cum =61023.37
no of bricks =61023.37/9*4.5*3 =502.25 or 503nos
for mortar 3.5 = 10 cum ,1 cum =0.35
0.35/(1+6)=0.05
for cement 0.05/0.0347 (for 50 kg cement bags ...1450kg/cum)
=1.440 or 1.5 no. of bags
for sand 0.05*6= 0.3 cum...
Ans.. 503 bricks, 1.5 no.bag of cement and 0.3 cum sand

Is This Answer Correct ?    10 Yes 20 No

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3&q..

Answer / ashish jain

Bricks- 460Nos
Sand- .29 cum
Cement- 1.7 begs

Is This Answer Correct ?    6 Yes 20 No

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3&q..

Answer / aravinh

395 bricks
53 kg cement
08 cft sand

Is This Answer Correct ?    11 Yes 27 No

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3&q..

Answer / v,anusha

500 bircks,58bags of cement,0.24cum of sand

Is This Answer Correct ?    30 Yes 72 No

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3&q..

Answer / omender sirohi

28 Brick,5 kg,20 kg

Is This Answer Correct ?    31 Yes 83 No

Post New Answer

More Civil Engineering Interview Questions

The foundations are placed below ground level, to increase?

0 Answers  


why curing is necessary?

5 Answers   Gammon,


What is the shelf life of a refractory used in boiler furnace ?

4 Answers   Monster,


what is the quantity of concrete required in 1 cubic meter volume without reinforcement

3 Answers   BLGC, TATA,


WHAT do mean by M-309

1 Answers  


In BBS,Find out the cutting length for a 2000*2200 column with 50 mm cover?

1 Answers   NKG Infrastructure,


what happened if the diameter of capillary tube is double then the capillary rise will be

7 Answers   Bhel,


The company is following same question pattern and giving same questions in all year for all batches from the starting of company they didnt even able to frame new question,,so guys if u want to place in cccl just mail me i will send the questions....ramyakvb@gmail.com....if u mug all those answers u will be selected no proper selction procedure is considered so it is better to place in some other company...All The best dont attend cccl

1 Answers  


what is 43 and 53 grade of cement? that 43 & 53 represents what?

8 Answers   L&T, Saint Gobain,


Define the various stages of the project planning process in construction.

0 Answers  


why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..

0 Answers   CST,


why provide water stopper in costruction joits

1 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)