Answer / rizwan akbar
bricks 500
cement 1.54 bags
sand .32 m^3
for C:S 1:6 brick work
| Is This Answer Correct ? | 3 Yes | 7 No |
Answer / md gyasuddin ahsan arfi
494 bircks,1.029 bags of cement,52.935 Cft of sand
| Is This Answer Correct ? | 5 Yes | 10 No |
Answer / syed muhsin.s
Bricks- 417 nos
Cement- 53 kg
Sand - 0.3 cum
mortor thickness deducted to be done.
u want to know how it comes????
| Is This Answer Correct ? | 10 Yes | 19 No |
Answer / vivek rai
1M=39.37Inch.
1Cum =61023.37
no of bricks =61023.37/9*4.5*3 =502.25 or 503nos
for mortar 3.5 = 10 cum ,1 cum =0.35
0.35/(1+6)=0.05
for cement 0.05/0.0347 (for 50 kg cement bags ...1450kg/cum)
=1.440 or 1.5 no. of bags
for sand 0.05*6= 0.3 cum...
Ans.. 503 bricks, 1.5 no.bag of cement and 0.3 cum sand
| Is This Answer Correct ? | 10 Yes | 20 No |
Answer / ashish jain
Bricks- 460Nos
Sand- .29 cum
Cement- 1.7 begs
| Is This Answer Correct ? | 6 Yes | 20 No |
The foundations are placed below ground level, to increase?
why curing is necessary?
What is the shelf life of a refractory used in boiler furnace ?
what is the quantity of concrete required in 1 cubic meter volume without reinforcement
WHAT do mean by M-309
In BBS,Find out the cutting length for a 2000*2200 column with 50 mm cover?
what happened if the diameter of capillary tube is double then the capillary rise will be
The company is following same question pattern and giving same questions in all year for all batches from the starting of company they didnt even able to frame new question,,so guys if u want to place in cccl just mail me i will send the questions....ramyakvb@gmail.com....if u mug all those answers u will be selected no proper selction procedure is considered so it is better to place in some other company...All The best dont attend cccl
what is 43 and 53 grade of cement? that 43 & 53 represents what?
Define the various stages of the project planning process in construction.
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
why provide water stopper in costruction joits
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)