Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) If the time delay of relay with TMS setting 0.1 is 10 sec, then what is the time delaty when the TMS setting is changed to 0.5
HAL,
1 6012How can decide the MVA rating of power transformer for substation like 220/132, 132/66, 66/33kv etc or even higher kv rating of substation???? Send me the strictly technical answer that shows your strong technical aptitude.
6 30164How to calculate the amount of Brick,cement & sand required for 1 cum of 230mm thick brick work with ratio 1:5 please give me an answer with detailed step
Assurance, Design Ideas, Jeno Maran Builders, Lanco, NamPower, NCC, Prime Adhivas Contrats, Simplex, SSM, SSM Builders and Promoters,
31 312704when eating ice cream, why the spoon of wooden material is always straight & plastic spoon is always convex in shape?
5 9779How harmonic block test are conducted on relays ( Siemens,Areva ect )power transformer using omicron kit?
2271
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
how the speed of the gets motor regulated. does it draw the same current on the all speed level.
What are the causes of failure of boiler tubes ?
What is the function of washer?
what is the working principal of pribe
what are the areas of improvement required in yourself to achieve your career goals? Describe what you are doing/plan to do to address the areas of improvement
why ten delta testing is carried out on power transformer
please tell no. & add. of consultancy who recruit me in power plant as instrumen engg. present i m working in power plant as ass.t instrument engg. thanku mahesh 09226562826
WHY IBM MAINFRAME TECHNOLOY IS USED.THOUGH, SINCE ITS INTRODUCTION IT HAS NO MAJOR UPDATATION OR MODIFICATION;BUT STILL IT IS IN DEMAND........WWWWWWWWWWWWWWHHHHHYYYYYYYY????????????
for 4 MVA , 33K.V/6.6K.V transformer. secondary side the connected load is 3000H.P. What is the rating of capacitor bank to be insttaled.
Compare csi and vsi?
how to calculate the concrete mix m30 by volume
I HAVE A 50A MCCB AS PER DESIGN LINE WIRE CONNECT UPWORD SIDE AND LOAD IS CONNECTED TO DOWNWARD SIDE TO THE MCCB.IF NOW ANY ONE CHANGE SUPPLY & LOAD(WISEVERSA) WHAT HAPPENS ? DOES MCCB OPERATION OR WORKING FUNCTION NORMAL IF YES THAN WHY THERE ARE MARKED LINE & LOAD ON MCCB.
What are the different types of flip-flops?
explain how do seamless pipes looks like and when they r used?