In which context do you use bills of material?
[ ] Material Requirements Planning
[ ] Execute Production
[ ] Goods Movements (to Help Data Entry)
[ ] Product Costing
[ ] Development/Engineering/Design
[ ] Documentation
[ ] Others
Answers were Sorted based on User's Feedback
Answer / jinchandra
In following context we use bills of material?
[1 ] Material Requirements Planning
[2 ] Execute Production
[ 4] Goods Movements (to Help Data Entry)
[3 ] Product Costing
[5 ] Development/Engineering/Design
[ 6] Documentation
[7 ] Others
Is This Answer Correct ? | 13 Yes | 3 No |
Answer / shanmukha
Product Costing :in order to observe the different cycle
times on the particular product in the bom,for the process
capability&for the costing of that particular product
Is This Answer Correct ? | 9 Yes | 3 No |
Answer / ranjit
Material Requirements Planning
[ ] Execute Production
[ ] Goods Movements (to Help Data Entry)
[ ] Product Costing
[ ] Development/Engineering/Design
[ ] Documentation
Is This Answer Correct ? | 4 Yes | 0 No |
What is scope of planning?
What are the keyfields found in mrp view 1?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What is MRO area & MRP group & some difference
What is the use of mrp pp evaluations?
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
What is Routing & rerouting
What are the types of MIC?
Tell me important of the Production scheduling profile what are the things have to maintain in this profile
What are the ‘bom categories’ supported by sap?
what is standard info set? where it is used in pp?
What is the use of mrp list?