What is "work center" in sap pp and what is the use of data in work centers?
No Answer is Posted For this Question
Be the First to Post Answer
What is the configuration done for Order type dependent parameter and confirmation parameter
Describe the change process for material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, engineering change management,revision levels, synchronization with current production orders, other.
Hi, Can any one tell me what we will do after the marking and releasing of standard price in product costing. Sravan
What are the types of master views for production and planning?
what are the basics of PP ?
What is the planning horizon?
what is standard info set? where it is used in pp?
After doing realization how we will check whether it is working or not?
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
WHAT IS THE DIFFRENCES BETWEEN SAP R3& APO
Explain the mrp controller and their uses.
What is the difference between production version & variant configuration?