In which context do you use bills of material?
[ ] Material Requirements Planning
[ ] Execute Production
[ ] Goods Movements (to Help Data Entry)
[ ] Product Costing
[ ] Development/Engineering/Design
[ ] Documentation
[ ] Others
Answer Posted / sriram
1.Material Requirements Planning
2.Execute Production
3.Product Costing
4.Documentation
5.Development/Engineering/Design
Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
What is requirement class and requirement type?
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?
What happens to plan after it has been converted into production order?
What is end user training
What parameters you maintain in “plant parameters” in configuration?
What is the t-code for changing production order and to display production order?
Define 'sop' (sales & operations planning)?
What are the types of master views for production and planning?
What is the use of plm (product lifecycle management) in sap pp?
Explain what is the need of mrp list if the stock requirement list is already given?
Explain the gaps and the steps involved in them.
What does a PP Consultant do in his/her real time?
What are the different type of BOM usage?
What are the types of MIC?