In which context do you use bills of material?

[ ] Material Requirements Planning
[ ] Execute Production
[ ] Goods Movements (to Help Data Entry)
[ ] Product Costing
[ ] Development/Engineering/Design
[ ] Documentation
[ ] Others

Answer Posted / sriram

1.Material Requirements Planning
2.Execute Production
3.Product Costing
4.Documentation
5.Development/Engineering/Design

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is requirement class and requirement type?

1192


any one can provide me some sample resume for SAP PP with 0 to 1 year experience?

3546


If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?

603


What happens to plan after it has been converted into production order?

619


What is end user training

1553






What parameters you maintain in “plant parameters” in configuration?

1755


What is the t-code for changing production order and to display production order?

705


Define 'sop' (sales & operations planning)?

715


What are the types of master views for production and planning?

670


What is the use of plm (product lifecycle management) in sap pp?

593


Explain what is the need of mrp list if the stock requirement list is already given?

621


Explain the gaps and the steps involved in them.

570


What does a PP Consultant do in his/her real time?

2339


What are the different type of BOM usage?

1238


What are the types of MIC?

1212