In which context do you use bills of material?
[ ] Material Requirements Planning
[ ] Execute Production
[ ] Goods Movements (to Help Data Entry)
[ ] Product Costing
[ ] Development/Engineering/Design
[ ] Documentation
[ ] Others
Answer Posted / sriram
1.Material Requirements Planning
2.Execute Production
3.Product Costing
4.Documentation
5.Development/Engineering/Design
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
What are all the ‘technical types of bom’?
Explain Flexible planning Procedure?
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
What are basic dates?
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
Explain the mrp list and their uses.
Difference between different strategy groups.
What is the difference between stock transport order and stock transfer order?
How can I use variable size items?
How do you integrate HR (employee) with PP?
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
What is primary cost and secondary cost?
Explain what is plm (product lifecycle management) in sap pp and what is the use?
What is the use of mrp group?
How the process time is calculated in a wc when both labour, machine categories exist?