Can you dispatch capacity for a single work center
Answer / raja sekhar
yes, we can, the main intention of capacity planning to balance the load at the work center.
Is This Answer Correct ? | 0 Yes | 0 No |
What is inventory
Which BOM maintenance functions do you require (copy functions, mass changes, and so on)?
Can't one material be assigned to more than one operation in a routing?
Integration between PP and QM Module.
One component 2 times assign to bom
What is the difference between time ticket and time event confirmation and when they are used ?
If process order is technically closed, by mistake I want to process that order again can I do it?
What is process keys
What is routing in sap pp?
Explain different inspection type you used .
Tell me different mrp types
what is alternative item group