In which context do you use bills of material?
[ ] Material Requirements Planning
[ ] Execute Production
[ ] Goods Movements (to Help Data Entry)
[ ] Product Costing
[ ] Development/Engineering/Design
[ ] Documentation
[ ] Others
Answer Posted / jinchandra
In following context we use bills of material?
[1 ] Material Requirements Planning
[2 ] Execute Production
[ 4] Goods Movements (to Help Data Entry)
[3 ] Product Costing
[5 ] Development/Engineering/Design
[ 6] Documentation
[7 ] Others
| Is This Answer Correct ? | 13 Yes | 3 No |
Post New Answer View All Answers
What is scope of planning?
What is time phased Planning?
Can’t one material be assigned to more than one operation in a routine?
Why work scheduling view is required for semi-finished and finished products?
What is Schedule Margin key. How floats works in scheduling?
Explain the mrp group and their uses.
Mention how mrp (material requirement planning) types are classified?
What do we do in the realization phase?
How to group employees for their allowances in payroll?
What is sap pp?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
how many times pcc can run for one material?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
If u maintain sub-contacting where and how will be reflect
What do you mean by pooled capacity?