Do your single-level BOMs represent production levels and do
you keep your BOM header materials in stock? If not, do you
produce non-stock items, or are some assemblies just used as
structural elements in a BOM?
Answers were Sorted based on User's Feedback
Answer / nvt
Yes
We can use the phantom material which is not produce but
have a stuctural element in the BOM
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / arun k
phontom assembly - i will create bom as gear box assembly but these contains gears but physically that gear box assembly is not there , it is called phontom assembly
Is This Answer Correct ? | 0 Yes | 0 No |
What is it 41 used for?
What is BPP? in detail.
What is the planning horizon?
How did you configure the payscale structure?
If the scenario is''Party is supplying some material we have to do the some processing operation on it, how it cab be handled in SAP"
Mention how mrp (material requirement planning) types are classified?
Define gaps.
What is the opening period?
We want to report on several status combinations like each order that has the status ‘not deleted’ and ‘not technically completed’. What set up is required?
What is MRP procedure
what is alternative item group
What is REM or What is REM profile