What is Alternative BOM?
Answers were Sorted based on User's Feedback
Answer / rajesh potdar
Header material having alternative component with either
same or differant item data.
Is This Answer Correct ? | 18 Yes | 5 No |
Answer / sonal
One material can have more than one BOMs. When you first create a BOM for a FG it is alternative 1. If you create another BOM for same FG with different components it will be alternative 2.
Is This Answer Correct ? | 3 Yes | 2 No |
Answer / bill fortran
alternative BOM is electronic BOM.
Typically used in critical situations.
Each BOM is like a alternative.
Removing existing data and creating developed 2006n/b1 is
alternative.
Is This Answer Correct ? | 3 Yes | 18 No |
What is the purpose of Catalog? how you reverse UD?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
• How are basic order dates determined?
What is the difference between the fixing type 1, 2, 3, 4?
Define mrp group
What are the parameters are there in Order type or in dependent para. config?
How many types of SOPs are there?
what is the capacity planner ?
Explain the planning steps for 100 products?
What is alternate item group?
What is MRP procedure
Do you need to use different BOMs for different applications, such as Production, Engineering, Plant Maintenance, and Costing (BOM usage)?