Do your single-level BOMs represent production levels and do
you keep your BOM header materials in stock? If not, do you
produce non-stock items, or are some assemblies just used as
structural elements in a BOM?
Answer Posted / nvt
Yes
We can use the phantom material which is not produce but
have a stuctural element in the BOM
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Explain the process of Material costing.
Steps to configure Production order type.
What is requirement class and requirement type?
Explain about rough cut planning
Explain transaction code KO88 or CO88.
Which tool you are using
Mention what is the use of t-code cs20 in bom?
What is time phased Planning?
How do I default it 41?
Why is work scheduling required for semi finished and finished products?
What are all the steps involved in Variant Configuration?
Define standard cost
What is meaning of customized reports?
Mention what is the production process in sap?
What do you do to run MRP for just one MRP Controller?