Do your single-level BOMs represent production levels and do
you keep your BOM header materials in stock? If not, do you
produce non-stock items, or are some assemblies just used as
structural elements in a BOM?
Answer Posted / nvt
Yes
We can use the phantom material which is not produce but
have a stuctural element in the BOM
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
In cost controlling information system mention the fields that are listed in the list screen of the report?
What is time phased Planning?
Which tool you are using
What is Planning time Fence?
What is the production process in sap?
what are Standard keys
What is golive actually? What is the role of a functional consultant in golive actually?
In implementation stage tell some standard scenario before AS-Is & TO-BE
How do you restrict the data to be entered in the payroll area?
What is the t-code for changing production order and to display production order?
How requirements( pir,sles order, customer requirement) are reduced after they are produced?
what do you mean by opening periods
Explain why their is need of production version ?
In the monthly lot size proc, how to generate lot at the end of Period?
Do you have any idea about Capacity Planning?