can any body tell me integration between pp with fi,mm,sd.
Answers were Sorted based on User's Feedback
Answer / pravin
PP integrates with MM in 1-Mat. Master (MRP view-2)
Procuerment type to determine procuerment elememt.
2-Goods Movments i.e. Goods issue against prod. order/
S.O.
PP with SD-In Mat. Master (MRP view-3)i.e. while defining
strategy in planning.
PP with FICO- in Mat. Master i.e. Costing and accounting
views
| Is This Answer Correct ? | 14 Yes | 5 No |
Answer / raghu reddy
SAP PP is part of the Controlling module thats why the
production execution transactiosn like CO01, CO11N, CO27
etc., begin with CO.
PP is with integrated with MM module as the movement types
like 261 (for backflusing) and 101 (goods receipt) come
from MM.
You cannot separate MM and PP. They are tightly integrated.
Batch management is also integrated.
ATP is integrated.
Handling Unit Management is integrated.
Subcontracting for external manufacturing is integrated
with MM and PP.
PP is also integrated WM (there is a config setting for WM-
PP interface.
Planning run is integrated between MM and PP.
PP is integrated with SD for requirement type, planning
strategies, item categories, ATP, MRP run etc.,
SOP, Demand management, etc., are integrated with SD
When it comes to MTO with variant config it is integrated
with PP and SD.
| Is This Answer Correct ? | 5 Yes | 1 No |
Answer / puru
pp integration with FICO isin work center in the screen of
cositng we have to assign work center with cost center
form here onlyalll the costing cale are taken
| Is This Answer Correct ? | 4 Yes | 2 No |
Answer / nanduri k. prasad
Though the question looks very small, the answer is very
big and probably takes months for me to explain.
However, the cost of product is calculated from the costing
view of the materials.
We have defined activity types and HR assignment in
workcenters and routings. Each activity type is assigned to
a cost center and whenever the production order is
confirmed the total issue of materials consumed is cost and
the cost of each activity is collected from the respective
cost centers and then finally the product cost comes out.
Once the material is receipt is done to prodution, the
document of mm like material document and accounting
documents will get updated.
Once the finished products are delivered by sales again the
material document and accounting documents gets updated to
know the current financial situation of the company.
| Is This Answer Correct ? | 3 Yes | 3 No |
Answer / rajesh
pp intergrates with all the modules and basic integration
between mm is master data (material master record).
For SD while delivering the stock, sales order consumes the
stock(va01)
And fico calculates the cost of machine and manpower and all
other cost including material costs.
| Is This Answer Correct ? | 4 Yes | 5 No |
Answer / dheeraj rawal
SAP PP-MM
1. Create Reservation
2. Create Purchase Requisition
3. Create Purchase Order
4. Goods Movement i.e goods Issue/Release
| Is This Answer Correct ? | 0 Yes | 3 No |
Tell bom header level & component level
Explain how the pp module is organized in sap?
Explain Flexible Planning procedure or How many levels of Flexible planning.
What is the use of t-code cs20 in bom?
Describe different types of scrap. Where all different types of scrap can be maintained on SAP user screens?
how to create report in sap pp
We have deleted a group key in an operation in routing and the same does not appear for this routing (CA02). But we noticed that entries are maintained in table PLPO and the deletion indicator is not set. How does the system remember this deletion of group key?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
What is processing class, where we do them and why?
What is 'capacity planning'?
You want to insert an inspection check point at the end of an operation. How would you do that?
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?
SAP Basis (1262)
SAP ABAP (3939)
SAPScript (236)
SAP SD (Sales & Distribution) (2717)
SAP MM (Material Management) (912)
SAP QM (Quality Management) (99)
SAP PP (Production Planning) (523)
SAP PM (Plant Maintenance) (252)
SAP PS (Project Systems) (138)
SAP FI-CO (Financial Accounting & Controlling) (2766)
SAP HR (Human Resource Management) (1180)
SAP CRM (Customer Relationship Management) (432)
SAP SRM (Supplier Relationship Management) (132)
SAP APO (Advanced Planner Optimizer) (92)
SAP BW (Business Warehouse) (896)
SAP Business Workflow (72)
SAP Security (597)
SAP Interfaces (74)
SAP Netweaver (282)
SAP ALE IDocs (163)
SAP Business One (110)
SAP BO BOBJ (Business Objects) (388)
SAP CPS (Central Process Scheduling) (14)
SAP GTS (Global Trade Services) (21)
SAP Hybris (132)
SAP HANA (700)
SAP PI (Process Integration) (113)
SAP PO (Process Orchestration) (25)
SAP BI (Business Intelligence) (174)
SAP BPC (Business Planning and Consolidation) (38)
SAP BODS (Business Objects Data Services) (49)
SAP BODI (Business Objects Data Integrator) (26)
SAP Ariba (9)
SAP Fiori (45)
SAP EWM (Extended Warehouse Management) (58)
Sap R/3 (150)
SAP FSCM Financial Supply Chain Management (101)
SAP WM (Warehouse Management) (31)
SAP GRC (Governance Risk and Compliance) (64)
SAP MDM (Master Data Management) (0)
SAP MRS (Multi Resource Scheduling) (0)
SAP ESS MSS (Employee Manager Self Service) (13)
SAP CS (Customer Service) (0)
SAP TRM (Treasury and Risk Management) (0)
SAP Web Dynpro ABAP (198)
SAP IBP (Integrated Business Planning) (0)
SAP OO-ABAP (Object Oriented ABAP) (70)
SAP S/4 HANA Finance (Simple Finance) (143)
SAP FS-CD (Collections and Disbursements) (0)
SAP PLM (Product Lifecycle Management) (0)
SAP SuccessFactors (33)
SAP Vistex (0)
SAP ISR (IS Retail) (28)
SAP IdM (Identity Management) (0)
SAP IM (Investment Management) (0)
SAP UI5 (59)
SAP SCM (Supply Chain Management) (51)
SAP XI (Exchange Infrastructure) (49)
SAP Cloud Platform (34)
SAP Testing (89)
SAP SolMan (Solution Manager) (63)
SAP MaxDB (116)
SAP GUI (15)
SAP AllOther (329)