can any body tell me integration between pp with fi,mm,sd.
Answer Posted / pravin
PP integrates with MM in 1-Mat. Master (MRP view-2)
Procuerment type to determine procuerment elememt.
2-Goods Movments i.e. Goods issue against prod. order/
S.O.
PP with SD-In Mat. Master (MRP view-3)i.e. while defining
strategy in planning.
PP with FICO- in Mat. Master i.e. Costing and accounting
views
| Is This Answer Correct ? | 14 Yes | 5 No |
Post New Answer View All Answers
How do I default it 41?
How is indian slab and us slab?
How can you create production order without routing and BoM?
What is requirement class and requirement type?
What is a ‘routing’ in pp?
What are the keyfields found in mrp view 1?
Explain Flexible Planning procedure or How many levels of Flexible planning.
What is sap pp?
What is sla (service level agreements)?
IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME
List out the basic procedure for dispatching operations in capacity leveling?
How to create prt master records?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
What are the types of master views for production and planning?
How does sap know that an operation has components as indicated by the component allocation indicator?