what are all the different manufacturing scenarios in pp?
Answers were Sorted based on User's Feedback
Answer / kartik
There are three scenarios in PP
1.Discreate Manufacturing
2.Repetative Manufacturing
3.Process Manufacturing
Is This Answer Correct ? | 44 Yes | 5 No |
Answer / amit naik
There are different scenarios in SAP PP module.
1)Make to stock
2)Make to order
3)External processing (Subcontracting)
4)Rework processing
5)Prodcution in another plant
Is This Answer Correct ? | 43 Yes | 11 No |
Answer / prabhu
There are 3 different manufacturing Scenarios in PP (ie)
1.Dis create manufacturing
2.Repetitive manufacturing
3.Process
Is This Answer Correct ? | 20 Yes | 1 No |
Answer / sathya
Generally there are three types of manufacturing Scenorios
will discussed in sap pp i.e
1.Discreate Manufacturing
2.Repetative Manufacturing
3.Process Manufacturing
In the above three types we have different scenorios that
is:
a)Make to stock
b)Make to order
c)External processing (Subcontracting)
d)Rework processing
e)Prodcution in another plant etc..
Is This Answer Correct ? | 11 Yes | 2 No |
Answer / manoj
There are different scenarios in SAP PP module.
1) Make to Stock and Make to Order. as per business process we are using different planning strategics, Mainly we are using, for Make to stock 10 and 40, 11- for REM, and 20- for MTO.
2) Subcontracting 2 Types mainly, Operation Subcontracting and Assembly Subcontracting,
3) General Rework Order, Job Work Order,
4) Planning and Production plant different
5) Production order Splatting with Product cost Collector.
6) Phantom Assembly,
7) Co-Product, and By product.
8) Collector Order consent,
=- Capacity Planning,
9) Serial Number, with Batch Management,
10) SOP, MRP, LTP, MPS,
11) Quota Arrangement in Production Order with Production Version, more small small scenarios we are using in PP, mainly Descartes Mfg, and REM,
Is This Answer Correct ? | 8 Yes | 0 No |
Answer / selvaganesh a.
Discrete,repetitive,project based manufacturing
Is This Answer Correct ? | 9 Yes | 3 No |
Answer /
1.Discreate Manufacturing
2.Repetative Manufacturing
3.Process Manufacturing
Is This Answer Correct ? | 7 Yes | 4 No |
Answer / batheiah
There are different scenarios in SAP PP module.
1)Make to stock
2)Make to order
3)External processing (Subcontracting)
4)Rework processing
5)Prodcution in another plant
Is This Answer Correct ? | 4 Yes | 7 No |
You want to create object dependencies in a bom for configurable materials? How would you navigate?
In sap-pp what are the costing parameters?
Is it possible to convert a 'multiple bom' into a 'variant bom'?
Explain schedule margin key
How to move to the realization phase?
Where have we to specify the teardown time in one operation?
What is Routing & rerouting
what is consignment?
How requirements( pir, sales order, customer requirement) are reduced after they are produced?
If there are some errors in goods movements, and less stock of material consumed, how can i solve that problem in SAP.
what are the basics of PP ?
what is the difference between backward scheduling and forward scheduling ?