Different types of consumption based planning.
No Answer is Posted For this Question
Be the First to Post Answer
Difference between PP and PI.
Integration between PP and MM Module.
Can't one material be assigned to more than one operation in a routing?
One component 2 times assign to bom
What is processing class, where we do them and why?
Where have we to specify the teardown time in one operation?
Do you need a complete history of your BOM changes? For what reasons (documentation, different technical states in operational areas, other)? For what types of BOMs? From what point in time (initial released status, other)?
i have one particular part 'A'. it is available in two storage location X & Y. when i run MRP, I don't want MRP to consider stock that are available in storage location Y. what should be done
How do you get the system to update this value from the routing?
Difference between plan cost, Actual cost and target cost.
Explain Kanban.
What is routing in sap pp?