can any body tell me integration between pp with fi,mm,sd.
Answer Posted / nanduri k. prasad
Though the question looks very small, the answer is very
big and probably takes months for me to explain.
However, the cost of product is calculated from the costing
view of the materials.
We have defined activity types and HR assignment in
workcenters and routings. Each activity type is assigned to
a cost center and whenever the production order is
confirmed the total issue of materials consumed is cost and
the cost of each activity is collected from the respective
cost centers and then finally the product cost comes out.
Once the material is receipt is done to prodution, the
document of mm like material document and accounting
documents will get updated.
Once the finished products are delivered by sales again the
material document and accounting documents gets updated to
know the current financial situation of the company.
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
What do you mean by pooled capacity?
How the process time is calculated in a wc when both labour, machine categories exist?
Explain what is the need of mrp list if the stock requirement list is already given?
What is the internal recruitment?
Define mrp group
What is a ‘bom’?
Define mrp list
What is pi sheet
What is planning horizon?
What is a 'product hierarchy'?
How system calculate the actual cost?
What is a ‘routing’ in pp?
Which tool you are using
Integration between PP and QM Module.
Explain the mrp controller and their uses.