What are different MRP types?
Answers were Sorted based on User's Feedback
Answer / vijay
mrp type defines the way of planning.
different mrp types:
1.mrp
2.lot size planning
3.no planning
4.external planning
5.time phased planning
6.auto matic reorder point planning
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / brij bhushan sharma
Material Planning of two types
1. MRP- Material Requirement planning- This planning based on quantity calculated based on BOM and requirement.
2. Consumption Based Planning- Its based on three parameter
A) Periodic Planning
B) Forecast Planning
C) Re-order planning
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / nanduri k. prasad
There are different MRP type as explained by others.
But the idea of asking this question by interviewer is
different.
The idea is to know how the material can be planned in
different types.
PD means normal mrp.
M1 means mps fixing -1 means always fixed quantity is
planned.
VB : means the material is always to ordered manually.
Like wise the plan is dependent on other factors like lot
size, month, week, etc.
Is This Answer Correct ? | 14 Yes | 19 No |
Answer / niville ho
It can be classied into different ways
and there are not absolute answers.
My answer is two types:
1. Demand-driven MRP
2. Teamwork MRP
Is This Answer Correct ? | 0 Yes | 5 No |
Answer / themba
master schedule
bill of material
stock and work in progress lead times
work orders
purchases order
yields
working days / times
Is This Answer Correct ? | 1 Yes | 8 No |
Answer / harjit
there are total 27 MRP tyep:
that include MRP procedure:
1) NO mrp
2) forecast based
3)MPS planning
4)reorder point planning
Is This Answer Correct ? | 19 Yes | 39 No |
Answer / ajay fulluke
single item,Single level
single item,Multilevel
single item,Interactive
single item,Sales order
single item,Project
Is This Answer Correct ? | 17 Yes | 72 No |
What is Routing & rerouting
How does sap know that an operation has components as indicated by the component allocation indicator?
Difference between different strategy groups.
How to move to the realization phase?
Explain Kanban.
Mention how mrp (material requirement planning) types are classified?
What is routing in sap pp?
what is SOP ? define it .
what is the major ticket in your experience
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
Product Costing Run is over. Now If I add one more rawmaterial for that material also it has to included & run the cost. But it is not happening?
Mention what are the t-codes for creating, changing and summarizing bom?