Answer Posted / nanduri k. prasad
There are different MRP type as explained by others.
But the idea of asking this question by interviewer is
different.
The idea is to know how the material can be planned in
different types.
PD means normal mrp.
M1 means mps fixing -1 means always fixed quantity is
planned.
VB : means the material is always to ordered manually.
Like wise the plan is dependent on other factors like lot
size, month, week, etc.
| Is This Answer Correct ? | 14 Yes | 19 No |
Post New Answer View All Answers
What is the planning time fence?
What are some important tables used in pp (production planning)?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
What are the different type of BOM usage?
Why work scheduling view is required for semi-finished and finished products?
SPRO path for order, confirmation or requirement class.
You want to integrate pp with fico. What steps would you take?
Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?
What is sap pp?
Mention what are the t-codes for creating, changing and summarizing bom?
What is testing & explain standard testing
What is meant by payscale structure? How did you configure payscale structure?
How requirements( pir, sales order, customer requirement) are reduced after they are produced?
Explain PI sheet.
Explain Availability check.