Answer Posted / vijay
mrp type defines the way of planning.
different mrp types:
1.mrp
2.lot size planning
3.no planning
4.external planning
5.time phased planning
6.auto matic reorder point planning
Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
What does a PP Consultant do in his/her real time?
what are Standard keys
What is the standard info set?
What is routing in sap pp?
What is scheduling
How to group employees for their allowances in payroll?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
What is alternative BOM, or diff between BOM group and Group BOM?
How mrp (material requirement planning) types are classified?
SPRO path for order, confirmation or requirement class.
Different types of consumption based planning.
Difference between PP and PI.
list the important tables used in pp.
What do you mean by basic dates
What is Schedule Margin key. How floats works in scheduling?