Answer Posted / vijay
mrp type defines the way of planning.
different mrp types:
1.mrp
2.lot size planning
3.no planning
4.external planning
5.time phased planning
6.auto matic reorder point planning
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Do you have any idea about Capacity Planning?
Consignment matl how will be use
What is alternate item group?
how many times pcc can run for one material?
I have having 14 years manufacturing experence & 6 years in SAP-PP/QM.Was a core member during implementation.Now I want to work as Functional Consultant in SAP-PP/QM.What should I do for getting the jobs.
Explain why there is need of production version?
Can any body explain me why work scheduling view is required for semi finished and finished products?
What is the role of an administrator in pa?
what do you mean by planning time fence
In implementation stage tell some standard scenario before AS-Is & TO-BE
What is detail scheduling
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
Explain Kanban.
List out the basic procedure for dispatching operations in capacity leveling?
Which BOM item category you have used?