Explain how ‘pp’ is ‘integrated’ with other modules?
No Answer is Posted For this Question
Be the First to Post Answer
How do I default it 41?
How the processing time is calculated in a wc when both labor, machine categories exist?
• What types of scrap can be maintained in PP basic data and how would they be considered during MRP repectively scheduling?
Difference b/w Co-product & by-Product
What is number range and where will be configure
List out the basic procedure for dispatching operations in capacity leveling?
Difference between MD04 and MD05.
Describe the change process for material BOMs
Explain what is routing in sap pp?
Explain the stock requirement list and their uses.
What is purpose of schedule margin key?
Do you know variant configuration?