One component 2 times assign to bom
Answer / mohit chhillar
1. yes we can assign one component 2 times by recursiev
bom.
3. assign the store location x in bom.
4. yes we can do it by change in parameter make routing
optional add crate production order in work shop floor. its
t- code is co01.
5. question is rough.
6. work center is a placed where all production activity are
carried out.
9. n times. but we assign one key at a time.
11. MTO make to order, MTS make to stock.
12. by release the production order partial.
13. Gap analysis means to identify the gaps between how the
business operates ad its needs against what the package can
& can't do.
15. alternative bom may be defined as the one bom is
corresponding to another bom.
Is This Answer Correct ? | 1 Yes | 0 No |
What is alternative bom
For REM the settings are dependent or normal?
Once the Production order is created, how to change the BOM and routing in that order?
What is SOP and types of SOP?
What is detail scheduling
specify three views for which formulas can be entered.(work center)
Which tool you are using
In SAP PP,how do you have relation with end users?
Difference between byproduct and co-product.
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
In lsmw which is most important step?
What are different MRP types?