define the CRP,MRP,DRP ?
Answer / rashmi kant
MRP- Material requirement planning
CRP- Capacity Planning
DRP- Distribution Reserource planning
Is This Answer Correct ? | 5 Yes | 0 No |
while extending the material master view after saving error is coming that the field material number is defined as a required field,it doesnt contain an entry. After selecting that it is showing the particular material may be locked. Pls do the needful.
How requirements( pir, sales order, customer requirement) are reduced after they are produced?
What is it 41 used for?
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
Difference between Item categories or what is variable size item or non stock item.
Where have we to specify the teardown time in one operation?
What is 'work center' in sap pp?
What is mrp group and what is the use of it?
What is the purpose of using capacity planning?
What do you do to run MRP for just one MRP Controller?
How does sap know that an operation has components as indicated by the component allocation indicator?
What are the parameters are there in Order type or in dependent para. config?