Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
No Answer is Posted For this Question
Be the First to Post Answer
Differentiate ‘variant bom’ from ‘multiple bom’?
what is the difference between backward scheduling and forward scheduling ?
What do you mean by basic dates
What is the planning time fence?
Define standard cost
What is special procurement & tell one special procurement briefly
If MRP type PD/ND in material master how will work flow.?
What is Auto GR?
Integration between PP and PM module.
What is testing & explain standard testing
what is the consumption based planning ?
2 Answers Gupta Power Infrastructure, Webcom,
What are the parameters are there in Order type or in dependent para. config?