i have one particular part 'A'. it is available in two storage location X & Y. when i run MRP, I don't want MRP to consider stock that are available in storage location Y. what should be done
Answers were Sorted based on User's Feedback
Answer / tim_coorgi
We have to define MRP storage location indicator as 1 for that storage location.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / arun k
in mrp4 view we need define the mrp storage locattion indicator as 1
Is This Answer Correct ? | 0 Yes | 0 No |
Tell me important of the Production scheduling profile what are the things have to maintain in this profile
What is work center? what are the standard things have to maintain....
What is MTS and MTO and the difference between them?
What is variant material ?
What is advantage of repetative manufacturing ?
What is COIS?
Define lsmw.
Is it possible to convert a 'multiple bom' into a 'variant bom'?
what do you mean by opening periods
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
Mention what is the production process in sap?
What is mean by Standard Value, Scheduling Margin Key, Production Version, Product Cost Collector, Control Key,Demand Management.