Answer Posted / rashmi kant
MRP- Material requirement planning
CRP- Capacity Planning
DRP- Distribution Reserource planning
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
Which BOM item category you have used?
Tell one biggest task for you
What is alternative BOM, or diff between BOM group and Group BOM?
You want to insert an inspection check point at the end of an operation. How would you do that?
What is the t-code for changing production order and to display production order?
List out the basic procedure for dispatching operations in capacity leveling?
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
What are the different type of BOM usage?
How can I use variable size items?
What is standard order type
Explain how ‘pp’ is ‘integrated’ with other modules?
Can't one material be assigned to more than one operation in a routing, why?
what are the constraints of Variant configuration?
What are dynamic actions? Give a few examples. What are it’s you used in them?
How to create prt master records?