Do you use group BOMs for engineering/design and copy or
assign them to plants at implementation?
Answer / sinds
during design phase designer maintain group bom then assign
to one or all plants.
and if bom created eith out ref to plant, bom valid through
all plants
Is This Answer Correct ? | 3 Yes | 0 No |
Do you know variant configuration?
Mention what is the t-code for changing production order and to display production order?
After doing realization how we will check whether it is working or not?
Explain schedule margin key
Explain the mrp controller and their uses.
why their is need of production version
What are the three 'mrp procedures'?
How the process time is calculated in a wc when both labour, machine categories exist?
Explain 'mrp' (material requirements planning)?
• How are basic order dates determined?
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?
What is MRP Area or How can I excluede one storage location stock from MRP?