What do you understand by “preset” during the installation process of bridge bearings?
No Answer is Posted For this Question
Be the First to Post Answer
Who name us Engineer & Why?
Explain what is structural frames or systems?
As per thumb rule cement required per 1 cum of M20 concrete is 411Kg/cum(1.57/5.5=0.285cum of cement i.e 0.285*1440=411Kg).But as per PWD rate analysis cement required is 347Kg/cum.the difference is 64Kg.This kind of difference is coming every grade of concrete.Can you give perfect suggestion regarding this.
What is the volume of sand in per cubic meter if we have a design mix of concrete is 1:2:4 (by volume).
FOR SAME AMOUNT OF RAINFALL & EQUAL CATCHMENT AREA THEN WHERE RUN OFF WILL BE HIGHEST?
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
m30 mix proportion as per IS code
what ratio of cement and sand we used for making cover
how 2 find out slap steel quantity ? plz help me
What is the cement content for 1m3 of M20,M25 concrete?
6 Answers Aishwarya Group, Omaxe, TI Construction,
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
0 Answers Hashmi Constructions,
What is language of Engineering?