1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / gajul santosh
Brick=500Nos
Sand=.257Cum
Cement=66kg
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
what is the calculation of raw material for 0.35cum of m-15
What is the difference between undo & redo?
What is the usage of zoom command?
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
What applicable rate of wct in bihar
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
what is the name of shuttering oil used in oman
Volume of 25kg putty bag & 40 kg putty bag volume??
what is escalation?how it is done?
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
What is the worlds largest concrete dam?
IS code for grade of concrete for bamboo lintel????