What tor stands for in tor steel?



What tor stands for in tor steel?..

Answer / Ankush Verma

TOR does not stand for anything specific in the context of tor steel. TOR is an acronym often used to refer to a screw thread direction (Threaded Right-Hand or Clockwise). In civil engineering, TOR steel refers to Toroidal Steel, a material shaped like a donut or ring.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions

1 Answers   State Bank Of India SBI,


What are the important hardware systems used for cad?

1 Answers  


HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL

1 Answers   ACMK,


what is high type road and low type roads

1 Answers  


where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?

1 Answers  


Why we are using 150 mm X 150 mm X 150 mm cubes for testing the compressive strength of concrete in CTM and why not other sizes?

1 Answers   BARC,


is there any difference in footing and slab reinforcement?

2 Answers  


1) what do you mean by rolling margin of steel ? 2)pls. tell the cut length formula of stirrups as per IS codes(take out cut length for a beam of 600*300mm with 40mm cover all sides)? 3)what is the multiplying factor of painting for sand faced plaster? 4)if your footing is of size1.9*1.6m . what quantity of length and width you will excavate means what extra margins you will allow as per IS codes in billing?

1 Answers  


Why concrete barriers have curved surface profiles?

1 Answers  


detailed calculation of the amount of cement used?

1 Answers  


When was the first motorway built in england?

1 Answers  


How to do base isolation using ETABS software?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)