Brick=500
Sand=.274cum
Cement=1.3bag or 66 kg
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
What is the largest concrete dam in the world?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
What is meant by a context menu in a cad software?
to draw bm diagrams for portal frames under different loadings//
Advantage of Aluminum form work in terms of activities can be skip and cost too
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
how many types of survey and what are levelling instrument?
Formula for calculation volume of essentric footing
types of laps in column
what could be the production cost of 1 cum of concrete by CP30 plant
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in