Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"

Answer Posted / gazi

Brick Wall Ft Meter 35.315
Vol of wall 35.3 cft 1.00 m3
"Vol of a brick without morter
9.5X4.5X2.75" 0.1 cft 0.00 m3
"Vol of a brick with morter
10X5X3" 0.1 cft 0.00 m3
Number of brick req 405.9 Nos 405.92 Nos

vol of req brick 27.3 cft 0.77 m3
Moter=brick wall vol-brick vol 8.0 cft 0.23
wet vol 10.4 cft 0.30
Mix ratio 1.0 6 1.00 6
cement vol 1.5 cft 0.04 m3
Cement Bag 1.19 bag 1.192 Bag
Sand 8.9 cft 0.253 m3

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why do you want to work here

2307


How do you maintain water pressure?

1118


How much material will consume for following specification water tank (9*7.5*6 feet)?

2036


pls give me ans to ACT formula cube testing porpuse

3009


What are the responsibilities of a site manager?

1063


How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.

2611


What is Density of cement, sand & aggregate ?

1467


How to calculate paint drums per meter square

2501


For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?

1920


the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C

2020


a butt weld is specified by

3003


what is the difference between replacement of cement by groundnut shell ash

3120


How much cement will require for 1Rmt Skirting laying

2263


Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance

2499


factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard

2061