Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is right time of slab DE shattering and beam boo tam.

Answers were Sorted based on User's Feedback



what is right time of slab DE shattering and beam boo tam...

Answer / map

It depends up on span of the beam normally after 7 days we can remove shuttering and support with props.

Is This Answer Correct ?    24 Yes 4 No

what is right time of slab DE shattering and beam boo tam...

Answer / azam

The time of slab deshutting after getting 67% strength at 4 or 7 days same for beam bottom and it also depend of span of beam.

Is This Answer Correct ?    21 Yes 3 No

what is right time of slab DE shattering and beam boo tam...

Answer / ronak shah

as per IS 456 beam bottome should be remove after 14 days.
concrete strength is more than 70%. if span is more than 11
mt then its remove after 21 days.

Is This Answer Correct ?    12 Yes 1 No

what is right time of slab DE shattering and beam boo tam...

Answer / sahilshah.civil@gmail.com

As per IS 456:2000

a) Columns/vertical member : 16-24 hrs
b) Slab - 3 day - prop to be kept below
c) Beam - 7 day - prop to be kept below

props to slab
a) spanning up to 4.5 m = 7 day
b) spanning over 4.5 m = 14 day

props to beam
a) spanning up to 6 m = 14 days
b) spanning over 6 m = 21 day

Is This Answer Correct ?    3 Yes 0 No

what is right time of slab DE shattering and beam boo tam...

Answer / mitesh patel

Beam Sides can be allowed to be removed on the next day of
casting.
Bottoms should be allowed only after 7 days of casting.
This is practical answer on site otherwise contractors will
run away.

Is This Answer Correct ?    1 Yes 0 No

what is right time of slab DE shattering and beam boo tam...

Answer / ananth

span length below 4.5m 7 days
span length over 4.5m 14days

Is This Answer Correct ?    1 Yes 0 No

what is right time of slab DE shattering and beam boo tam...

Answer / md nezam

DE shattering can be done for slab bottom after 3days and Beam bottom after 7 day,but immediately props to be refixed.

Is This Answer Correct ?    3 Yes 3 No

what is right time of slab DE shattering and beam boo tam...

Answer / sagar tiwari

span length over 6m than 28 days
span length below 6m than 14 days

span length over 4.5m than 14 days
span length below 4.5m than 7 days

Is This Answer Correct ?    0 Yes 0 No

what is right time of slab DE shattering and beam boo tam...

Answer / vinaysagar donakanty

The above answer were right but it is advisable to check strength of cubes at 3 days or 7 days or 14 days before deshuttering.

Is This Answer Correct ?    0 Yes 0 No

what is right time of slab DE shattering and beam boo tam...

Answer / r.ranjith kumar

slab de shetting 2 day

Is This Answer Correct ?    0 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

what qualifications did you need to become a civil engineer?

2 Answers   L&T,


what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15

0 Answers   ABV,


How to calculate the water content cement ratio

3 Answers   Godway, Modern Construction Company,


which software better design in structure design or Rcc design(STAAD PRO,TEKLA STRUCTURE)

43 Answers  


WHAT IS THE %WASTAGES OF CEMENT, BRICK,TILES, STEEL,IN 1 M3,10M2,1 TON RESPECTIVELY

6 Answers  


8mm.2l@7" c/c in footing column drawing,mean of 2l,4l in the Column drawing please answer give with example,thankyou,

2 Answers   L&T,


Define relative co-ordinates?

0 Answers  


Describe the term BILL OF QUANTITY (BOQ)?

4 Answers  


How you can turn off the display for dimension in CAD?

0 Answers  


what is the difference between weir and a barrage

12 Answers   AAI Airports Authority Of India, CIT, TCI Constructions,


in one SQM plaster how much Cement and sand consumed in ratio 1:4

0 Answers   ULM,


What is the maximum allowable 'Silt content' in River sand

16 Answers   IVRCL, Om Buildcon,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)