what is right time of slab DE shattering and beam boo tam.
Answers were Sorted based on User's Feedback
Answer / map
It depends up on span of the beam normally after 7 days we can remove shuttering and support with props.
| Is This Answer Correct ? | 24 Yes | 4 No |
Answer / azam
The time of slab deshutting after getting 67% strength at 4 or 7 days same for beam bottom and it also depend of span of beam.
| Is This Answer Correct ? | 21 Yes | 3 No |
as per IS 456 beam bottome should be remove after 14 days.
concrete strength is more than 70%. if span is more than 11
mt then its remove after 21 days.
| Is This Answer Correct ? | 12 Yes | 1 No |
Answer / sahilshah.civil@gmail.com
As per IS 456:2000
a) Columns/vertical member : 16-24 hrs
b) Slab - 3 day - prop to be kept below
c) Beam - 7 day - prop to be kept below
props to slab
a) spanning up to 4.5 m = 7 day
b) spanning over 4.5 m = 14 day
props to beam
a) spanning up to 6 m = 14 days
b) spanning over 6 m = 21 day
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / mitesh patel
Beam Sides can be allowed to be removed on the next day of
casting.
Bottoms should be allowed only after 7 days of casting.
This is practical answer on site otherwise contractors will
run away.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / ananth
span length below 4.5m 7 days
span length over 4.5m 14days
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / md nezam
DE shattering can be done for slab bottom after 3days and Beam bottom after 7 day,but immediately props to be refixed.
| Is This Answer Correct ? | 3 Yes | 3 No |
Answer / sagar tiwari
span length over 6m than 28 days
span length below 6m than 14 days
span length over 4.5m than 14 days
span length below 4.5m than 7 days
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / vinaysagar donakanty
The above answer were right but it is advisable to check strength of cubes at 3 days or 7 days or 14 days before deshuttering.
| Is This Answer Correct ? | 0 Yes | 0 No |
what qualifications did you need to become a civil engineer?
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
How to calculate the water content cement ratio
3 Answers Godway, Modern Construction Company,
which software better design in structure design or Rcc design(STAAD PRO,TEKLA STRUCTURE)
WHAT IS THE %WASTAGES OF CEMENT, BRICK,TILES, STEEL,IN 1 M3,10M2,1 TON RESPECTIVELY
8mm.2l@7" c/c in footing column drawing,mean of 2l,4l in the Column drawing please answer give with example,thankyou,
Define relative co-ordinates?
Describe the term BILL OF QUANTITY (BOQ)?
How you can turn off the display for dimension in CAD?
what is the difference between weir and a barrage
12 Answers AAI Airports Authority Of India, CIT, TCI Constructions,
in one SQM plaster how much Cement and sand consumed in ratio 1:4
What is the maximum allowable 'Silt content' in River sand
16 Answers IVRCL, Om Buildcon,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)