what is right time of slab DE shattering and beam boo tam.
Answer Posted / ronak shah
as per IS 456 beam bottome should be remove after 14 days.
concrete strength is more than 70%. if span is more than 11
mt then its remove after 21 days.
| Is This Answer Correct ? | 12 Yes | 1 No |
Post New Answer View All Answers
400 ku d/c clearess ketan hota hai?
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
Explain creep?
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
how to calculate testing date
rimmer in pile foundation
how to take concrete quantity for precast segment for viaduct project?
Which are the Steel tests ?
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
What is the tallest man made structure in the world?
RR masonry rate analysis
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
What is zoning permit?
it is possiblee to produce concrete with out cracks...