what is right time of slab DE shattering and beam boo tam.
Answer Posted / mitesh patel
Beam Sides can be allowed to be removed on the next day of
casting.
Bottoms should be allowed only after 7 days of casting.
This is practical answer on site otherwise contractors will
run away.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What are moment of inertia and its importance in civil engineering?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
What is the best type of wood glue?
All aptitude question of Bechtel
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What is type failure of road surface? how to repair the failure of road surface?
What are the responsibilities of a construction manager?
What is unit weight of normal concrete?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
how can calculate the compressive strength of concrete cylinder by water cement ratio ?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?