what is right time of slab DE shattering and beam boo tam.
Answer Posted / mitesh patel
Beam Sides can be allowed to be removed on the next day of
casting.
Bottoms should be allowed only after 7 days of casting.
This is practical answer on site otherwise contractors will
run away.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
What materials were used to build the golden gate bridge?
What is meant by dimensioning?
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
what is meant by shear center?????
How to estabilish reinforcement Steel rolling margin for a building projects ?
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
Explain the Strength of brick?
Explain the various stages of the project planning process in construction?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
can you provide a link for manual design of building?
what is the steel difference between np-2 and np-3 pipes and weight also
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
Why Is Propping Required For Long Structures Once The Form Work Is Removed?