As per IS 456:2000

a) Columns/vertical member : 16-24 hrs
b) Slab - 3 day - prop to be kept below
c) Beam - 7 day - prop to be kept below

props to slab
a) spanning up to 4.5 m = 7 day
b) spanning over 4.5 m = 14 day

props to beam
a) spanning up to 6 m = 14 days
b) spanning over 6 m = 21 day

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate the force on a column of three story building. What should be the base concrete height?.

1649


at what pressure ply-wood is obtained by gluing wooden sheets

2083


what is difference between GTS bench mark and temporary bench mark

3923


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1638


how i convert mm into standard wire guage (SWG)no.

2591






What are the benefits of rcc pipes over steel designed pipes?

777


what is civil all interview questions

2069


What is the life of anaerobic Digester if it is used for municipal solid waste digetion.

1805


Civil engineering material testing Standard results

1861


Slab quantity 

1601


How many types bend used in civil reinforcing

2775


CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL

1704


foundation details for 25 ton weight Furnace on 2 supports and 2 tilters

1101


what is the coefficient for running feet to cft coversion both area and price

1923


reinforcement slab, beam and column formulas?

2190