As per IS 456:2000
a) Columns/vertical member : 16-24 hrs
b) Slab - 3 day - prop to be kept below
c) Beam - 7 day - prop to be kept below
props to slab
a) spanning up to 4.5 m = 7 day
b) spanning over 4.5 m = 14 day
props to beam
a) spanning up to 6 m = 14 days
b) spanning over 6 m = 21 day
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
How to calculate the force on a column of three story building. What should be the base concrete height?.
at what pressure ply-wood is obtained by gluing wooden sheets
what is difference between GTS bench mark and temporary bench mark
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how i convert mm into standard wire guage (SWG)no.
What are the benefits of rcc pipes over steel designed pipes?
what is civil all interview questions
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
Civil engineering material testing Standard results
Slab quantity
How many types bend used in civil reinforcing
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
what is the coefficient for running feet to cft coversion both area and price
reinforcement slab, beam and column formulas?