what is right time of slab DE shattering and beam boo tam.
Answer Posted / map
It depends up on span of the beam normally after 7 days we can remove shuttering and support with props.
| Is This Answer Correct ? | 24 Yes | 4 No |
Post New Answer View All Answers
What are the applications of cad?
What happens to Load at yielding ?
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
in plate load test what is the thickness of plate 20mm 5mm 50mm none
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
What are the uses of layer?
how to caliculate required amount of cement and sand required for 1cu.m.
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
explain what do you mean by the property development.
how meny typs of renging rod?
What is chemical composion test
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
Discuss some applications of modular elasticity?
Difference between lime, distemper and plastic emulsion?
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used